CIC have written a new Risk Management Briefing entitled "Consulting in an NEC environment".
NEC contracts cater for the client/contractor and client/consultant relationship.
The Risk Management Briefings are a series of free guidance documents produced by the CIC Liability Panel. The briefings examine current areas of concern in relation to liability.
This briefing refers specifically to NEC4, Professional Services Contract (PSC) and its importance to the intended £650 billion spend on public and private infrastructure projects announced by the UK government in 2021.
The Liability Panel was set up to consider liability, legal and insurance issues. The panel drafts and publishes standard form contract documentation for consultants as well as the freely available briefings.
Nasir Khan, Chair of the Liability Panel said: "The UK government announced in 2021 that it has chosen the NEC4 contracts as one of the three options to deliver its £650 billion spend over the next 10 years. The CIC Liability Panel’s risk management briefing on Consulting in an NEC Environment provides consultants some key points to watch out for. The NEC contracts are known for their collaborative and flexible approach to project management. However, the consultants need to be mindful of the Scope, Z Clauses, Programme, and their obligations to mitigate potential liability risks.”
A full suite of CIC Risk Management Briefings can be downloaded for free from the CIC website.
This article appears on the CIAT news and blogsite as "Guidance on working with New Engineering Contracts" dated January 9, 2023.
--CIAT
[edit] Related articles on Designing Buildings
- As Low As Reasonably Practicable (ALARP).
- CMA and IRM publish 2020 competition law risk guide.
- Code of practice for project management.
- Design risk management.
- Facility security risk management plan.
- Interface risk in construction.
- NEC contract change management systems.
- NEC contracts - road development and management schemes.
- NEC contracts and collaborative working.
- NEC early contractor involvement.
- NEC early warning notices - a tool of mutual benefit.
- NEC3.
- NEC4.
- NEC Option A: Priced contract with activity schedule.
- NEC Option B: Priced contract with bill of quantities.
- NEC Option C: Target contract with activity schedule.
- NEC Option D: Target contract with bill of quantities.
- NEC Option E: Cost reimbursable contract.
- New Engineering Contract.
- Project manager.
- Project risk.
- Reflections on 2021.
- Resource allocation in design and construction.
- Risk appetite.
- Risk assessment.
- Risk assessment: a quality perspective.
- Risk feedback.
- Risk management.
- Risk mapping.
- The NEC and the Z clause.
- Third party dependencies.
- Time Risk Allowance.
- What is a hazard?
- Z clauses.
Featured articles and news
OpenUSD possibilities: Look before you leap
Being ready for the OpenUSD solutions set to transform architecture and design.
Global Asbestos Awareness Week 2025
Highlighting the continuing threat to trades persons.
Retrofit of Buildings, a CIOB Technical Publication
Now available in Arabic and Chinese aswell as English.
The context, schemes, standards, roles and relevance of the Building Safety Act.
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.